Fernandina Beach Municipal Airport Terminal – under construction

Another update on our new airport terminal here on Amelia Island which is nearing completion and is scheduled for a mid-June opening. Lots of activity going on today with exterior painting, grading of the parking lots and what not.

20180502_135000

20180502_135751

If you haven’t been following this construction project previously, the building is designed to resemble an F4U Corsair fighter plane from WWII. The “tail, canopy and propeller cowling” will be added soon. Stay tuned.

20180312_145901 logo

20180105_155251

Thanks for stopping by!

Chris ^.^

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Windowless Windows

The new Fernandina Beach Municipal Airport terminal under construction.

20180416_134505 logo

Thanks for stopping by!

Camera: Samsung Galaxy S8+

Chris and Carol ^.^

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Beach Renourishment on Amelia Island

A never-ending process of replenishing lost sand along our barrier island. The sand is dredged from the St. Marys channel and then pumped on to the beach where heavy duty bulldozers then spread the sand. These operations will go on 24/7 for the next 2 to 3 weeks.

20180312_154449

20180312_154045

20180312_154155

Looks like fun!

Thanks for stopping by!

C&C ^.^

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Window Seat

20180210_121548 logo

Fernandina Beach Municipal Airport, Amelia Island. New terminal under construction.

Thanks for stopping by! Check out our online camera shop at https://www.ccstudio2380.com

C&C ^.^

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Clouds & Steel

Structure

20180210_121739 logo

 

Fernandina Beach Municipal Airport, Amelia Island. New terminal building under construction.

Thanks for stopping by! Be sure to visit our online shop at https://www.ccstudio2380.com

C&C ^.^

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Small Town America – Fernandina Beach

Classic small-town image – Peck High School completed in 1927. It was the only school on Amelia Island, Florida that taught grades 1-12 to African-American students. The good city of Fernandina Beach still uses this building and it is kept in excellent condition. It made for a beautiful picture today on this lovely warm Winter’s day.

peck hs logo

20180210_123922

20180210_124010

Celebrating Black History Month here on Amelia Island.

Thanks for stopping by!

Chris

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

Tour Guide – Amelia Island Beach 2.8.18

It’s been a very rough 6 months or so here on Amelia Island – a tropical storm passed nearby and 2 early nor’easters have wrecked havoc on our normally pristine beaches. Our tour today will show us some of the preparations underway for a large-scale beach replenishment project – moving sand from point A to B, C, D, and F.

pole logo

more pipes logo

beach tubes logo

beach couplers logo

dozer logo

sand tracs logo

gulls logo

Just lookin’ for a little peace.

Dredging and then the pumping of sand on to the beach is expected to start around March 1st. Lots of heavy machinery, pipes, and whatnot over the next 2-3 months. When they’re done our beach will be ready for whatever nature has in store this hurricane season.

Submitted for consideration for the Weekly Photo Challenge – Tour Guide

Thanks, Chris

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.

 

Yashica Man

yulee and ps

Yashica Pentamatic S and Mr. David Yulee – downtown Fernandina Beach, Amelia Island – Florida

Chris

Please respect that all content, including photos and text, are the property of this blog and its owner, Yashica Pentamatic Fanatic, Yashica Sailor Boy, Yashica Chris.

Copyright © 2015-2018 Yashica Pentamatic Fanatic, Chris Whelan
All rights reserved.